Welded Mesh Temporary Fence Panel Dimensions: What the Drawing Should Show

Compare the clear mesh opening, wire pitch, frame tube and leg spacing as well as panel height and width. These dimensions affect how the panel handles and whether it fits the bases and clamps in your fleet.

Mesh Aperture

The aperture is the clear opening between wires.

Wire Pitch, Count and Mass

Mass rises with the square of wire diameter, so wire size is the main lever on panel weight.

Frame Section Size

The frame carries the wind force from the mesh to the legs and into the bases.

Larger panels, 3.5 m wide, need an intermediate vertical tube or a horizontal mid-rail to limit the span of the mesh and to stiffen the frame against racking during handling.

Weld Layout

Two sets of welds hold the panel together: the cross-wire welds within the mesh and the welds joining wire ends to the frame.

The Process

The mesh of a welded-mesh temporary fence panel is made by resistance cross-wire welding. Line wires are fed through the machine, a cross wire is dropped onto them, and a row of copper electrodes presses each crossing while a pulse of current passes through it. The contact between two round wires is small, so the current density is very high; the steel at the contact heats to forging temperature in a fraction of a second and the electrode force pushes the wires into one another. No filler metal is used. A machine welding a 2.3 m wide mesh makes about forty welds at each stroke.

The quality of every weld depends on four interacting settings, namely current, time, electrode force and the condition of the electrodes, and on the surface condition of the wire. The range of settings that gives acceptable welds is called the process window. This document describes how the window is defined, what moves it, and how to keep production inside it.

Distortion Control

Each weld heats and then shrinks a small volume of steel. Across a full sheet the effects add up and appear as three kinds of distortion.

A flat, square sheet matters for the next operation. The mesh must drop into the frame with every wire end meeting the tube, so that the wire-to-frame welds can be made without forcing the mesh. A mesh that has to be pulled into place leaves the finished panel stressed and bowed.

DistortionCause
Bow across the widthMore heat or setdown on one face; unequal electrode force top and bottom
Camber along the lengthLine wires of unequal tension or straightness; uneven heat across the width
Out-of-square sheetCross wire not perpendicular to line wires at the moment of welding
Pitch error accumulating along the sheetFeed slip; thermal growth of feed mechanism
Waviness of thin wiresSetdown too high; wires overheated

Edge Conditions

  • Top edge: no wire projects above the top tube, and the tube itself is continuous and smooth.
  • Side edges: the vertical frame tubes are parallel and at a consistent spacing so that couplers fit at any height. Wire ends are trimmed flush with the weld.
  • Legs: the leg length below the bottom rail matches the socket depth of the bases, and the leg spacing matches the socket spacing of two adjacent bases.

Keeping the Process in the Window

The settings sheet for each mesh specification should record wire diameters and condition, current, weld time, electrode force, target setdown and the minimum shear load.

CheckMethod
Weld shear strengthShear test on sample crossings from centre and edges
Visual appearanceNo expulsion, burning or missed welds
Sheet dimensionsWidth, length, diagonals, pitch over ten spaces
FlatnessSheet on flat table

Bringing the Choices Together

The geometry should be recorded on a dimensioned drawing that states tube size, wire diameters, both pitches, the number of wires, the weld layout, corner radius, leg length and spacing, and tolerances.

A drawing example for mesh dimensions

A 60 mm centre-to-centre pitch and 4 mm wires give a nominal clear opening of 56 mm in that direction. This is an illustration of the terminology. Ask for both measurements on the actual drawing, then verify them with the panel geometry and tolerances on the approved sample.

Verify the drawing against a production sample

Ask for a drawing that identifies which dimensions are measured on the bare steel and which describe the finished panel. Measure a representative sample across the legs, frame and mesh, then fit it to the intended bases and clamps. If the order adds to a mixed fleet, include a panel from the oldest series still in use in the trial.

Frequently asked questions

Which dimensions should appear on a temporary mesh panel drawing?

Ask for overall width and height, clear mesh opening, post dimensions, leg geometry and the intervals where panels connect, with the applicable tolerances.

Why should installed bay width be confirmed separately?

Overall panel width and installed pitch can differ at connectors. Verify the pitch with the intended base and coupler before completing the takeoff.

Related product and planning information
Welded mesh panels · Request a quote

Share this article